Academic Journal

THE HYDROPOWER POTENTIALS OF THE TOSOR, TON, AKTEREK, TURASU RIVERS OF THE ISSYK-KUL LAKE BASIN

Bibliographic Details
Title: THE HYDROPOWER POTENTIALS OF THE TOSOR, TON, AKTEREK, TURASU RIVERS OF THE ISSYK-KUL LAKE BASIN
Source: НАУКА, НОВЫЕ ТЕХНОЛОГИИ И ИННОВАЦИИ КЫРГЫЗСТАНА. :39-47
Publisher Information: Publishing House of Scientific Journals and Children's Fiction, 2022.
Publication Year: 2022
Subject Terms: altitude marks, электроэнергия, среднесуточные отметки, высотные отметки, среднемесячные отметки, hydropower potential, мощность, среднегодовые отметки, 6. Clean water, average annual marks, power, расход воды, average daily marks, 13. Climate action, average monthly marks, electricity, гидроэнергетический потенциал, water consumption
Description: В данной работе по изученности выбраны реки Тосор, Тон, Актерек и Турасу Тонского района Иссык-Кульского бассейна. Проведен анализ данных по расходам речных стоков – это среднегодовые, среднемесячные и среднесуточные. Изучен рельеф местности, высотные отметки, просчитаны уклоны по течению рек от устья до истоков. Для определения гидроэнергетического потенциала рек Тосор, Тон с притоком Аксай, Актерек и Турасу были выполнены теоретические исследования гидроэнергетических характеристик этих рек, определены схемы размещения и участки для предполагаемого размещения малых ГЭС в нижнем течении рек. Определены валовые, технические и экономические гидроэнергетические потенциалы указанных рек. Экономические гидроэнергетические потенциалы рек также были определены по месяцам, за холодный период года – с ноября по апрель месяц, за тёплый период – с мая по октябрь и за 12 месяцев года. In this work, the Tosor, Ton, Akterek and Turasu rivers of the Ton region of the Issyk-Kul basin are selected according to the degree of study. The analysis of data on the flow of river flows – average annual, average monthly and average daily. The relief of the area, elevation marks were studied, the slopes along the rivers from the mouth to the sources were calculated. To determine the hydropower potential of the Tosor, Ton rivers with the Aksai, Aksai, Akterek and Turasu tributaries, theoretical studies of the hydropower characteristics of these rivers were carried out, placement schemes and sites for the proposed placement of small HPPs in the lower reaches of the rivers were determined. The gross, technical and economic hydropower potentials of these rivers have been determined. The economic hydropower potentials of the rivers were also determined by months, for the cold period of the year - from November to April, for the warm period - from May to October and for 12 months of the year.
Document Type: Article
Language: Russian
ISSN: 1694-8491
1694-8483
DOI: 10.26104/nntik.2022.87.27.007
Accession Number: edsair.doi...........f110a274aa66a4238c8e00c89c689aa5
Database: OpenAIRE
Description
ISSN:16948491
16948483
DOI:10.26104/nntik.2022.87.27.007