Academic Journal
Impact of Using an Exchange Model (EM) to Support the Early Assessment Process of Industrialized Timber Projects.
| Title: | Impact of Using an Exchange Model (EM) to Support the Early Assessment Process of Industrialized Timber Projects. |
|---|---|
| Authors: | Rojas, Claudia, Mourgues, Claudio, Rosa, Pilar de la, Mesa, Harrison, Ruz, Francisco, Guindos, Pablo |
| Source: | Buildings (2075-5309); Jun2025, Vol. 15 Issue 11, p1835, 18p |
| Subject Terms: | Information sharing, Information processing, Structural design, Project evaluation, Industrialization, Standardization |
| Abstract: | Standardized information on the processes and requirements for information exchanges is critical to ensure accurate cost estimations. However, traditional methods based on 2D information lack the standardization and information required for efficient and reliable early commercial evaluation. This study aims to evaluate the effectiveness and efficiency of the information exchange model (EM-01) proposed for the commercial evaluation of industrialized timber projects. This study adopted two illustrative cases of projects to make a comparative analysis between the traditional method that prefabrication companies use and the EM-01. The evaluation focused on effectiveness, efficiency, level of certainty, and the user's perception. The results indicate that both methods enable project evaluation. However, the EM-01 offers better efficiency by reducing work time, reduces uncertainty by minimizing assumptions, and improves the user's perception of the reliability of the commercial evaluation. The EM-01 provides more standardized information and specific structural design data supporting the early commercial evaluation. This study supports the idea that incorporating standardized information into the processes and requirements for information exchanges enhances the accuracy and reliability of early commercial evaluation in industrialized timber projects. [ABSTRACT FROM AUTHOR] |
| Copyright of Buildings (2075-5309) is the property of MDPI and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.) | |
| Database: | Complementary Index |
| FullText | Text: Availability: 0 CustomLinks: – Url: https://resolver.ebsco.com/c/fiv2js/result?sid=EBSCO:edb&genre=article&issn=20755309&ISBN=&volume=15&issue=11&date=20250601&spage=1835&pages=1835-1852&title=Buildings (2075-5309)&atitle=Impact%20of%20Using%20an%20Exchange%20Model%20%28EM%29%20to%20Support%20the%20Early%20Assessment%20Process%20of%20Industrialized%20Timber%20Projects.&aulast=Rojas%2C%20Claudia&id=DOI:10.3390/buildings15111835 Name: Full Text Finder (for New FTF UI) (ns324271) Category: fullText Text: Full Text Finder MouseOverText: Full Text Finder |
|---|---|
| Header | DbId: edb DbLabel: Complementary Index An: 185866604 RelevancyScore: 1007 AccessLevel: 6 PubType: Academic Journal PubTypeId: academicJournal PreciseRelevancyScore: 1007.33093261719 |
| IllustrationInfo | |
| Items | – Name: Title Label: Title Group: Ti Data: Impact of Using an Exchange Model (EM) to Support the Early Assessment Process of Industrialized Timber Projects. – Name: Author Label: Authors Group: Au Data: <searchLink fieldCode="AR" term="%22Rojas%2C+Claudia%22">Rojas, Claudia</searchLink><br /><searchLink fieldCode="AR" term="%22Mourgues%2C+Claudio%22">Mourgues, Claudio</searchLink><br /><searchLink fieldCode="AR" term="%22Rosa%2C+Pilar+de+la%22">Rosa, Pilar de la</searchLink><br /><searchLink fieldCode="AR" term="%22Mesa%2C+Harrison%22">Mesa, Harrison</searchLink><br /><searchLink fieldCode="AR" term="%22Ruz%2C+Francisco%22">Ruz, Francisco</searchLink><br /><searchLink fieldCode="AR" term="%22Guindos%2C+Pablo%22">Guindos, Pablo</searchLink> – Name: TitleSource Label: Source Group: Src Data: Buildings (2075-5309); Jun2025, Vol. 15 Issue 11, p1835, 18p – Name: Subject Label: Subject Terms Group: Su Data: <searchLink fieldCode="DE" term="%22Information+sharing%22">Information sharing</searchLink><br /><searchLink fieldCode="DE" term="%22Information+processing%22">Information processing</searchLink><br /><searchLink fieldCode="DE" term="%22Structural+design%22">Structural design</searchLink><br /><searchLink fieldCode="DE" term="%22Project+evaluation%22">Project evaluation</searchLink><br /><searchLink fieldCode="DE" term="%22Industrialization%22">Industrialization</searchLink><br /><searchLink fieldCode="DE" term="%22Standardization%22">Standardization</searchLink> – Name: Abstract Label: Abstract Group: Ab Data: Standardized information on the processes and requirements for information exchanges is critical to ensure accurate cost estimations. However, traditional methods based on 2D information lack the standardization and information required for efficient and reliable early commercial evaluation. This study aims to evaluate the effectiveness and efficiency of the information exchange model (EM-01) proposed for the commercial evaluation of industrialized timber projects. This study adopted two illustrative cases of projects to make a comparative analysis between the traditional method that prefabrication companies use and the EM-01. The evaluation focused on effectiveness, efficiency, level of certainty, and the user's perception. The results indicate that both methods enable project evaluation. However, the EM-01 offers better efficiency by reducing work time, reduces uncertainty by minimizing assumptions, and improves the user's perception of the reliability of the commercial evaluation. The EM-01 provides more standardized information and specific structural design data supporting the early commercial evaluation. This study supports the idea that incorporating standardized information into the processes and requirements for information exchanges enhances the accuracy and reliability of early commercial evaluation in industrialized timber projects. [ABSTRACT FROM AUTHOR] – Name: Abstract Label: Group: Ab Data: <i>Copyright of Buildings (2075-5309) is the property of MDPI and its content may not be copied or emailed to multiple sites without the copyright holder's express written permission. Additionally, content may not be used with any artificial intelligence tools or machine learning technologies. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract.</i> (Copyright applies to all Abstracts.) |
| PLink | https://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=edb&AN=185866604 |
| RecordInfo | BibRecord: BibEntity: Identifiers: – Type: doi Value: 10.3390/buildings15111835 Languages: – Code: eng Text: English PhysicalDescription: Pagination: PageCount: 18 StartPage: 1835 Subjects: – SubjectFull: Information sharing Type: general – SubjectFull: Information processing Type: general – SubjectFull: Structural design Type: general – SubjectFull: Project evaluation Type: general – SubjectFull: Industrialization Type: general – SubjectFull: Standardization Type: general Titles: – TitleFull: Impact of Using an Exchange Model (EM) to Support the Early Assessment Process of Industrialized Timber Projects. Type: main BibRelationships: HasContributorRelationships: – PersonEntity: Name: NameFull: Rojas, Claudia – PersonEntity: Name: NameFull: Mourgues, Claudio – PersonEntity: Name: NameFull: Rosa, Pilar de la – PersonEntity: Name: NameFull: Mesa, Harrison – PersonEntity: Name: NameFull: Ruz, Francisco – PersonEntity: Name: NameFull: Guindos, Pablo IsPartOfRelationships: – BibEntity: Dates: – D: 01 M: 06 Text: Jun2025 Type: published Y: 2025 Identifiers: – Type: issn-print Value: 20755309 Numbering: – Type: volume Value: 15 – Type: issue Value: 11 Titles: – TitleFull: Buildings (2075-5309) Type: main |
| ResultId | 1 |