Sebo, T. L. (1986). A LONG RANGE PRODUCTION/RESOURCE PLANNING SYSTEM USING LINEAR PROGRAMMING. Computers & Industrial Engineering, 11(1-4), 180-183. https://doi.org/10.1016/0360-8352(86)90074-4
Παραπομπή σε μορφή Chicago (17η εκδ.)Sebo, Traci L. "A LONG RANGE PRODUCTION/RESOURCE PLANNING SYSTEM USING LINEAR PROGRAMMING." Computers & Industrial Engineering 11, no. 1-4 (1986): 180-183. https://doi.org/10.1016/0360-8352(86)90074-4.
Παραπομπή σε μορφή MLA (9th εκδ.)Sebo, Traci L. "A LONG RANGE PRODUCTION/RESOURCE PLANNING SYSTEM USING LINEAR PROGRAMMING." Computers & Industrial Engineering, vol. 11, no. 1-4, 1986, pp. 180-183, https://doi.org/10.1016/0360-8352(86)90074-4.
Πρόσοχή: Οι παραπομπές μπορεί να μην είναι 100% ακριβείς.