Li, M., Hong, Y., Li, W., Yang, Q., Qu, T., He, Z., & Huang, G. Q. (2026). Operationalizing advance-postponement for replenishment-assembly synchronization in VMI-ATO systems under demand-forecast evolution. Computers & Industrial Engineering, 219, N.PAG. https://doi.org/10.1016/j.cie.2026.112164
Παραπομπή σε μορφή Chicago (17η εκδ.)Li, Mingxing, Yan Hong, Wanshan Li, Qiang Yang, Ting Qu, Zhen He, και George Q. Huang. "Operationalizing Advance-postponement for Replenishment-assembly Synchronization in VMI-ATO Systems Under Demand-forecast Evolution." Computers & Industrial Engineering 219 (2026): N.PAG. https://doi.org/10.1016/j.cie.2026.112164.
Παραπομπή σε μορφή MLA (9th εκδ.)Li, Mingxing, et al. "Operationalizing Advance-postponement for Replenishment-assembly Synchronization in VMI-ATO Systems Under Demand-forecast Evolution." Computers & Industrial Engineering, vol. 219, 2026, p. N.PAG, https://doi.org/10.1016/j.cie.2026.112164.